Contact Us
Town of St. Marys (general contact)
175 Queen Street East,
St. Marys, ON.
N4X 1B6
P. 519-284-2340
F. 519-284-2881
Email Us
Map this Location
Posted on Wednesday, April 16, 2025 03:25 PM
CN Rail is requiring the Town to temporarily close three railway crossings to carry out necessary rail repairs. The railway crossings will be closed starting Tuesday, April 22 at 6:00 a.m. The work is scheduled to be completed by Tuesday, April 29 at 5:00 p.m.
Required repairs include the replacement of damaged rail and track ties, replacement of track ballast, and installation of planking on railway crossings at the following locations:
A detour will be set up...
Posted on Wednesday, April 16, 2025 03:00 PM
CN Rail is requiring the Town of St. Marys to temporarily close three railway crossings to carry out necessary rail repairs. The railway crossings will be closed starting Tuesday, April 22 at 6:00 a.m. The work is scheduled to be completed by Tuesday, April 29 at 5:00 p.m.
Required repairs include the replacement of damaged rail and track ties, replacement of track ballast, and installation of planking on railway crossings at the following locations:
James St. S
Elgin St. E
Elizabeth St.
A detour will be set...
Posted on Wednesday, April 16, 2025 10:13 AM
The Town of St. Marys is providing an update on the Pyramid Recreation Centre splash pad.
As recommended by Council, the splash pad will be decommissioned. The decommissioning process will begin on April 16, with crews on site to remove the existing structure.
In the summer of 2024, the Town consulted with Open Space Solutions, who originally installed the splash pad in 2008, to conduct an assessment and provide recommendations for future actions. The evaluation revealed that substantial upgrades would...
Posted on Tuesday, April 15, 2025 01:15 PM
The St. Marys Firefighter’s are preparing the grill for the annual breakfast!
This year’s breakfast is happening on Sunday, May 4 at the Fire Hall (172 James St. S) from 8:00 a.m. to 12:00 p.m. Parking is available in the DCVI lot. The cost is $10 per adult or $5 per child aged five to 12. Children under the age of five eat for free. Breakfast will include pancakes, sausage, bacon, scrambled eggs, fried eggs, toast, juice, coffee, and tea.
The annual breakfast has traditionally been held on the...
Posted on Friday, April 11, 2025 11:20 AM
Event is a collaboration with Hodges Funeral Home
As spring blossoms in St. Marys, there’s a new opportunity to come together as a community and beautify one of our town’s most special green spaces – the St. Marys Cemetery (150 Cain St.).
A new Cemetery Decoration Day, in partnership with Andrew L. Hodges Funeral Home, will take place from 9:00 a.m. to 12:00 p.m. (noon) on Saturday, May 10. It will be an opportunity to clear graves of winter debris and plant flowers and decorate for the season – as well...
CN Rail is requiring the Town to temporarily close three railway crossings to carry out necessary rail repairs. The railway crossings will be closed starting Tuesday, April 22 at 6:00 a.m. The work is scheduled to be completed by Tuesday, April 29 at 5:00 p.m. Required repairs include the replacement of damaged rail and track ties, replacement of track ballast, and installation of planking on railway crossings at the following locations:
A detour will be set up along Huron St. S. and Elizabeth St., as well as along King St. with signage in place to guide vehicles. Travelers are advised to expect delays during the temporary closure and to plan accordingly.
VIA rail will not be impacted by the temporary closures, but it may cause some delays due to reduced track speeds in the area.
For a more information and a detailed map or the closure and detour routes, read our full media release.
The Pyramid Recreation Centre pool is undergoing significant upgrades. The Aquatics Centre has been closed to the public since November 11, 2024, to accommodate renovations to the space. The project involves installing a new HVAC unit and exhaust systems to improve air quality. Repairs are also being made to any parts of the Aquatics Centre that have experienced wear and tear.
Due to unexpected construction delays and supply chain issues, the renovation work is now expected to extend the closure until July 2025.
Read our full media release for details.
CN Rail is requiring the Town to temporarily close three railway crossings to carry out necessary rail repairs. The railway crossings will be closed starting Tuesday, April 22 at 6:00 a.m. The work is scheduled to be completed by Tuesday, April 29 at 5:00 p.m. Required repairs include the replacement of damaged rail and track ties, replacement of track ballast, and installation of planking on railway crossings at the following locations:
A detour will be set up along Huron St. S. and Elizabeth St., as well as along King St. with signage in place to guide vehicles. Travelers are advised to expect delays during the temporary closure and to plan accordingly.
VIA rail will not be impacted by the temporary closures, but it may cause some delays due to reduced track speeds in the area.
For a more information and a detailed map or the closure and detour routes, read our full media release.
The Pyramid Recreation Centre pool is undergoing significant upgrades. The Aquatics Centre has been closed to the public since November 11, 2024, to accommodate renovations to the space. The project involves installing a new HVAC unit and exhaust systems to improve air quality. Repairs are also being made to any parts of the Aquatics Centre that have experienced wear and tear.
Due to unexpected construction delays and supply chain issues, the renovation work is now expected to extend the closure until July 2025.
Read our full media release for details.